RFQ Intake Checklist: What Builders Should Send to Get a Clean Timber Quote
Published March 20, 2026 by MVP Pro Timber
Builder RFQ intake checklist for heavy timber: drawings, elevations, spans, connection expectations, delivery/site constraints, schedule, finish expectations, and decision deadlines to speed quoting.
RFQ Intake Checklist: What Builders Should Send to Get a Clean Timber Quote The fastest way to get a clean, accurate timber quote is to send a complete, builder-friendly RFQ package. When key inputs are missing, the quote either slows down or arrives with assumptions that can create surprises later. This checklist is a practical RFQ intake list you can copy/paste and send with your request. Builder RFQ intake checklist (copy/paste) Project basics Project name + location (county/state) Building type (lodge, barn home, commercial, etc.) Desired scope (frame only, frame + deck/loft interface notes, etc.) Drawings Floor plans (PDF) Elevations (PDF) Roof plan + sections Any structural notes relevant to the timber scope Key dimensions Overall footprint Plate heights and finished-floor elevations Major spans and beam sizes (if known) Overhangs and roof pitch Interfaces to confirm early Roofline datum and eave/ridge intent Deck/loft connections Stair stringer interface areas Chimney/fireplace locations MEP penetration expectations Site and logistics Delivery constraints (access, turning radius, staging area) Crane access and set day constraints Any known weather/seasonal limitations Schedule Target set window Dry-in window and priority milestones Decision deadlines (what needs to be locked by when) Finish expectations Exposed timber finish expectations (visibility, protection requirements) Any special stain/finish notes Contact and approval chain Primary builder contact Who approves changes Preferred communication method Builder move that speeds quotes Send one zipped package or one Drive link with the checklist answered. Clear inputs reduce assumption-driven quoting and prevent later surprises. Where MVP Pro Timber helps We help builders scope timber packages cleanly and coordinate key interfaces so the quote is accurate and the job runs smoothly from set to closeout.