Builder documentation checklist for timber builds: what to photograph, when to capture it, and how to label it to reduce disputes, speed punch lists, and protect warranty closeout.

# Inspection and Documentation: What to Photograph and Record for Timber Builds The best way to reduce disputes on timber projects is simple: document the right things at the right times. Many closeout arguments are not about what happened, but about what cannot be proven later. This builder checklist covers what to photograph and record so you can move faster through punch, protect warranty closeout, and keep trades aligned. ## Builder checklist: what to photograph and record ### 1. Baseline after the set - Overall frame from each corner - Plumb/level checks (with a readable reference) - Key connection areas and any field adjustments ### 2. Connection details before they get covered - Hardware/plates/bolts at representative locations - Any engineered details or special conditions - Areas that will be enclosed early (hard to access later) ### 3. Roofline and interface areas - Eave/ridge interface areas - Deck/loft connections - Any penetration locations (chimney, skylight, mechanical) ### 4. Moisture and protection - Weather events and protection measures - Any stains/marks when they first appear (time-stamped) ### 5. Trade damage log (simple and consistent) For any cosmetic damage: photo + location + date + brief note. Avoid opinion; record facts. ### 6. Labeling that actually works Use a consistent naming format (date + area + viewpoint + issue) and keep photos in a shared project folder. ## Builder move that pays off Assign a five-minute photo routine at the end of key days: after set, after decking, after roof framing, before enclosure, and at final punch. ## Where MVP Pro Timber helps We help builders define a practical documentation checklist and the key “cover-up” inspection points so you reduce disputes and speed closeout.