Connection Kit Readiness: The Heavy Timber Checklist Builders Should Run Before Crane Day
Published March 17, 2026 by MVP Pro Timber
A builder-side checklist for plates, bolts, straps, embed locations, and kit staging so missing hardware does not stall crane-day flow.
# Connection Kit Readiness: The Heavy Timber Checklist Builders Should Run Before Crane Day Heavy timber installs lose momentum when the crane is ready but the connections are not. A single missing plate, wrong bolt length, or unverified embed location can turn a clean pick sequence into a stall sequence. A connection kit readiness check is a short builder-side review that protects crane-day flow. ## The connection kit readiness checklist ### 1. Verify the connection schedule against the field plan Confirm you have a clear connection schedule (what connects to what, with which hardware) and that the field team can reference it quickly without hunting through drawings. ### 2. Confirm embed locations and any pre-work If embeds, brackets, or blocking must be in place before the timber arrives, confirm locations are laid out and verified in the field. Crane day is not the time to discover a missing embed. ### 3. Confirm kit completeness (and count spares) Plates, straps, bolts, nuts, washers, and specialty fasteners should be counted and staged. Identify any long-lead or unique pieces and stage spares for high-friction items. ### 4. Stage kits by sequence, not by convenience Hardware should be staged to support the pick sequence. If hardware is staged in a single pile, crane day becomes sorting day. ### 5. Protect kits from weather and site traffic Hardware loss is often a staging problem. Keep kits boxed, labelled, and protected from mud and site traffic, and define a single access point for kit retrieval. ### 6. Assign a "connection lead" for crane day One accountable person should own kit retrieval, counts, and quick problem-solving so the crane crew does not become the hardware crew. ## Builder move that protects crane-day flow Run a 20–30 minute connection kit readiness check the week before delivery: schedule clarity, embed verification, kit counts, sequence staging, protection, and accountability. It prevents avoidable stalls and keeps picks moving. ## Where MVP Pro Timber helps We help builders review connection kit readiness and sequencing before crane day. If you are preparing a lodge, barn home, clubhouse, or custom residence package, send your install window and connection concerns and we will review the kit-readiness plan before crane day becomes a stall day.